
What is a supply chain?
Before a product reaches the shelf it passes through many links: raw material supplier, manufacturer, warehouse and distribution, retailer and finally the customer. Three things flow between those links:
- Goods: flow from supplier to customer. With returns, the direction reverses.
- Information: orders, demand and sales data; mainly flow from customer back to supplier.
- Money: payments flow from customer to supplier.
The supplier side is called upstream and the end-consumer side downstream.
Click a link to see its role in the chain. Solid arrows show goods; dashed arrows show information and money.
All links
| Link | Role |
|---|---|
| Supplier | Provides raw materials and parts. The most upstream link. |
| Manufacturer | Turns inputs into products; the production plan relies on the demand forecast. |
| Warehouse and distribution | Holds stock, picks orders and ships them. Logistics service providers (3PL) often work here. |
| Retailer | Offers the product to the end user; sales data flows back up the chain. |
| Customer | The source of demand. The most downstream link; returns flow back from here. |
How logistics differs from supply chain management
A frequently cited source for definitions is the professional body CSCMP (Council of Supply Chain Management Professionals).
Supply chain management (CSCMP): the planning and management of all activities involved in sourcing and procurement, conversion and all logistics management activities. It also includes coordination and collaboration with channel partners such as suppliers, intermediaries, third-party service providers and customers. In essence, it integrates supply and demand management within and across companies.
Logistics management (CSCMP): the part of supply chain management that plans, implements and controls the efficient, effective forward and reverse flow and storage of goods, services and related information between the point of origin and the point of consumption in order to meet customers' requirements.
| Logistics management | Supply chain management | |
|---|---|---|
| Scope | Flow and storage: transport, warehousing, inventory, order fulfilment, network design | Logistics plus procurement and manufacturing |
| Coordination | — | Also covers coordination with marketing, sales, product design, finance and IT |
| Relationship | A subset of supply chain management | The broader function that includes logistics |
Logistics companies play different roles in this structure: a 3PL runs logistics operations, a 4PL manages several providers through a single interface. See Warehousing and inventory management for more.
The SCOR model: a common language for processes
SCOR is a reference model for describing and measuring supply chain processes. It is owned by ASCM (Association for Supply Chain Management). The current version is the SCOR Digital Standard (SCOR DS); according to ASCM it is open access and emphasises a synchronous network rather than a linear chain. According to the trade press, SCOR DS was announced in September 2022.
| Process | What it covers | Related topics in this guide |
|---|---|---|
| Orchestrate | Strategy, business rules, network design, data analytics, risk and sustainability | Carrier liability and cargo insurance (risk) |
| Plan | Planning supply and demand | The container shipment timeline |
| Order | Customer purchasing, pricing, payment | Payment methods and letters of credit; Incoterms® 2020 |
| Source | Buying inputs | Your first export or import: a step-by-step roadmap; How are import duties calculated in Türkiye? |
| Transform | Manufacturing, assembly, maintenance and repair | — |
| Fulfill | Delivery planning, shipping, installation, invoicing | FCL, LCL and freight calculation; Air cargo: the AWB and chargeable weight; Warehousing and inventory management |
| Return | Diagnosis, sorting and circular activities | Cargo damage and the claims process |
How it differs from the earlier model: The earlier SCOR had six processes: Plan, Source, Make, Deliver, Return and Enable. SCOR DS added Orchestrate, split Deliver into Order and Fulfill and renamed Make as Transform. It also added resilience, economic and sustainability metrics.
The "Related topics" column is our own mapping and not part of SCOR.
Push and pull
| Push | Pull | |
|---|---|---|
| Production and distribution follow | Forecast demand | Actual customer demand |
| Inventory | Often higher | Low inventory is the aim |
The approach chosen has a direct effect on stock levels: a link working to a forecast builds up stock, while a link working to actual demand aims to run with less.
The bullwhip effect
Small fluctuations in end-customer demand grow larger in orders the further up the chain you go. The retailer's orders swing more than demand, the wholesaler's more than the retailer's, and the manufacturer's most of all. This is called the bullwhip effect.
Origins: The phenomenon was probably first documented in Forrester's 1958 Harvard Business Review article. Forrester did not use the term "bullwhip"; he showed how the interaction of information, material and money flows leads to delays, oscillation and amplification. Lee, Padmanabhan and Whang say they first heard the term from an executive during a visit to Procter & Gamble in the early 1990s.
Four causes: In two articles published in 1997 ("The Bullwhip Effect in Supply Chains", Sloan Management Review; "Information Distortion in a Supply Chain: The Bullwhip Effect", Management Science), Lee, Padmanabhan and Whang identified four causes:
- Demand forecast updating: each link updates its forecast from the orders it sees and amplifies the swings.
- Order batching: placing orders in batches and at intervals makes demand look more volatile than it is.
- Price fluctuations: buyers forward-buy during promotions, and orders then drop.
- Rationing and shortage gaming: when supply is tight, buyers order more than they need to increase their allocation.
The title of one of the articles describes the phenomenon as information distortion: a link further up the chain sees not actual demand but the orders of the link below it.
Supply chain risk and resilience
The bullwhip effect is a swing that the chain generates by itself. Chains are also shaken by disruptions from outside: a fire at a supplier's plant, a strike at a port, a security problem on a sea route. In Christopher and Peck's 2004 article, resilience is a system's capacity to recover after a disruption, either to its former state or to a better one.
Where does risk come from?
The same article divides supply chain risk into five sources. The logistics examples are our own:
| Source | Where it arises | Logistics example |
|---|---|---|
| Process | In the firm's own activities, including the transport, communication and infrastructure that support them | A warehouse management system outage, a breakdown in the firm's own fleet |
| Control | In the rules and systems that govern processes | A badly set order quantity or safety stock rule |
| Demand | In the flow between the firm and its customers | A sudden surge in orders, a major customer unable to pay |
| Supply | In the flow between the firm and its suppliers | Production stopping for a single-sourced part |
| Environmental | Outside the supply network | Natural disaster, accident, war, embargo, socio-political change, closure of a sea route |
Transport risk is not a separate heading in this classification: a breakdown in your own vehicles is a process risk, a delay in a supplier's transport is a supply risk, and the closure of a strait is an environmental risk. Political risks (sanctions, additional duties, border closures) fall under environmental.
Four principles of resilience
Christopher and Peck propose four principles for a resilient chain:
- Build resilience into the design: resilience is set as a goal alongside cost and service when the network is designed, not added afterwards.
- Collaboration: information is shared with suppliers, customers and service providers, and risk is managed as a problem of the network rather than of one firm.
- Agility: being able to respond quickly to unexpected changes in demand or supply. Its two pillars are end-to-end visibility and short lead times.
- A risk management culture: continuity is owned at board level, and risk is assessed in major decisions.
Redundancy or flexibility?
In their 2005 article in MIT Sloan Management Review, Sheffi and Rice distinguish two routes to resilience:
| Redundancy | Flexibility | |
|---|---|---|
| What it means | Holding extra resources against disruption | Being able to keep goods moving another way when disruption hits |
| Logistics example | Safety stock, a second supplier, spare capacity | Plans prepared for more than one port and route, the ability to work with different carriers, standard packaging and equipment |
| Cost | Paid every day; pays back only if there is a disruption | Needs investment, but can also give a competitive edge in day-to-day work |
There is a trade-off between efficiency and resilience here. A lean chain cuts cost by keeping stock and spare capacity to a minimum, but it also has less of a buffer when disruption comes. Sheffi and Rice's point is that redundancy is pure cost unless a disruption happens, while flexibility can pay for itself on normal days too. For how safety stock is calculated, see Warehousing and inventory management.
Reading a disruption: a route change
Ships sailing round the Cape of Good Hope instead of through Suez because of security problems in the Red Sea show how an environmental risk spreads through the chain. The freight and capacity side is covered in Shipping markets and freight cycles. On the supply chain side, the first effect is stock in transit.
Under Little's law, average inventory equals the flow rate multiplied by the time spent in the system. A hypothetical example: an importer brings in 10 containers a week, and the route change adds 10 days to the voyage. The number of extra containers sitting in transit is (10 ÷ 7) × 10 ≈ 14 containers. That stock has been or will be paid for but cannot be sold, so working capital is tied up. To keep the shelves stocked, safety stock also has to be recalculated for the longer and less predictable lead time.
Where to go next in the guide
- The physical journey of the goods: The container shipment timeline, Intermodal and combined transport
- Documents: Transport documents compared: bill of lading, sea waybill, AWB, CMR and CIM
- Parties and roles: The parties in trade and logistics
- Stock and warehousing: Warehousing and inventory management
Test yourself
- According to CSCMP, how are logistics management and supply chain management related? (Answer: Logistics management is part of supply chain management.)
- In SCOR DS, which two processes replaced the earlier Deliver process? (Answer: Order and Fulfill.)
- A retailer orders far more than usual during a promotion and then stops ordering. Which cause of the bullwhip effect is this? (Answer: Price fluctuations, i.e. forward buying.)