Alsancak Port
Port · İzmir

At a glance
| Operator | Alport[1]Operator of the cargo port; the handover was completed as of 1 August 2026. Before that the port was operated by TCDD (İZKA 2019). |
|---|---|
| Owner | TVF İzmir Limanı Yönetim ve Yatırım AŞ[2]Company name in the article's narration; the TVF executive quoted in the same article says "TVF Liman AŞ".Sources give different values: Türkiye Varlık Fonu (TVF)[1] (4 August 2026); TVF İzmir Limanı Yönetim ve Yatırım AŞ[2] (16 October 2026) |
| Year opened | 1959[3]Construction began in 1955; the first section was completed in 1959. |
| Specialization | not disclosed |
| Cargo types | Dry and liquid bulk, general cargo, container, passenger[3]İZKA 2019, p. 53. |
| Annual capacity (containers) | 1,000,000 TEU/year[4]Alport's business development director: they aim to raise annual handling capacity from 1 million TEU to 1.6 million TEU. |
| Annual capacity (cargo) | not disclosed |
| Annual capacity (vehicles) | not disclosed |
| Yard area | 266,000 m²[3]About 266,000 m² used for storage; total port area 635,000 m². İZKA 2019 (TCDD period). |
| Vessels served at once | 24[3]Can serve 24 vessels at the same time (İZKA 2019, TCDD period). |
Berths
| Berth | Length | Depth | Use |
|---|---|---|---|
| Berth 1 | 140 m[3] | 8 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Passenger[3] |
| Berth 2 | 190 m[3] | 8.5 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Passenger[3] |
| Berth 3 | 130 m[3] | 10.5 m[3]Current depth (after silting); design depth 10.5 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 4 | 120 m[3] | 10.5 m[3]Current depth (after silting); design depth 10.5 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 5 | 150 m[3] | 10.5 m[3]Current depth (after silting); design depth 10.5 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 6 | 75 m[3] | 10 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 7 | 130 m[3] | 10 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 8 | 120 m[3] | 9.5 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 9 | 122 m[3] | 9.5 m[3]Current depth (after silting); design depth 10.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 10 | 126 m[3] | 6 m[3]Current depth (after silting); design depth 7.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 11 | 97 m[3] | 6.5 m[3]Current depth (after silting); design depth 7.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 12 | 125 m[3] | 7 m[3]Current depth (after silting); design depth 8.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo and bulk[3] |
| Berth 13 | 150 m[3] | 9.5 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 14 | 144 m[3] | 10 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 15 | 144 m[3] | 10 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 16 | 162 m[3] | 10 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 17 | 150 m[3] | 10 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 18 | 150 m[3] | 10 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 19 | 150 m[3] | 10 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 20 | 120 m[3] | 10.2 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 21 | 125 m[3] | 10.2 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 22 | 120 m[3] | 10 m[3]Current depth (after silting); design depth 13.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Container[3] |
| Berth 23 | 150 m[3] | 10.5 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Bulk[3] |
| Berth 24 | 150 m[3] | 11 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | Bulk[3] |
| Berth 25 | 150 m[3] | 11 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo[3] |
| Berth 26 | 140 m[3] | 11.5 m[3]Current depth (after silting); design depth 12.0 m. Table 4.1, sourced from the 2011 TCDD İzmir Port operating plan. | General cargo[3] |
Vessel limits
| Maximum length overall (LOA) | not disclosed |
|---|---|
| Maximum beam | not disclosed |
| Maximum draft | not disclosed |
| Maximum DWT | not disclosed |
| Largest vessel (TEU) | not disclosed |
| Vessel limit (as stated by the source) | not disclosed |
Equipment
| Type | Count | Capacity | Outreach (rows) |
|---|---|---|---|
| Ship-to-shore crane (STS) | 5[3]Listed as "Gantry Crane", 40 t, built 1986-1999; the report's glossary defines SSG/STS as "Gantry Crane - Ship to Shore Gantry". İZKA 2019 (TCDD period). | 40 t[3] | not disclosed |
| Mobile harbour crane (MHC) | 4[3]"Other (MHC) (third-party owned)", 90 t. İZKA 2019 (TCDD period). | 90 t[3] | not disclosed |
| RTG | 14[3]35-42 t; 10 units stack 5+1 wide and 4+1 high, 4 units 6+1 wide and 5+1 high. İZKA 2019 (TCDD period). | not disclosed | not disclosed |
| Reach stacker | 15[3]İZKA 2019, Table 4.5 (TCDD-period inventory; the situation after the 2026 handover is not in the source). | 40 t[3] | not disclosed |
| Other | 9[3]Mobile crane, 10-25 t, built 1977-1983; used for general cargo. İZKA 2019 (TCDD period). | not disclosed | not disclosed |
| Terminal tractor | 39[3]Listed as tractor units ("Çeker"), 25-50 t (plus 59 trailers). İZKA 2019 (TCDD period). | not disclosed | not disclosed |
Services
| Reefer connections | not disclosed |
|---|---|
| LCL / CFS | Yes[3]The storage table lists open CFS of 1,818 m² and covered CFS of 1,810 m² (İZKA 2019). |
| Rail connection | Yes[4]Alport: the existing rail link will be strengthened; the rail share of outbound cargo is planned to reach 30%. |
| Road connection | Yes[3]Via the viaduct link, vehicles leaving the port reach the ring road without entering city traffic (İZKA 2019). |
| Bonded warehouse | Yes[3]The port has a bonded warehouse building; the report describes it as insufficient (İZKA 2019). |
| Dangerous goods | not disclosed |
Calling services
Calling services: not disclosed.
Quiz
The answers are in this atlas's sourced data. Pick an option, then check.
Frequently asked questions
Who operates Alsancak Port?
Ownership remains with the Türkiye Wealth Fund, while the cargo port has been operated by Alport since 1 August 2026; no concession was transferred. Before that the port was operated by TCDD.
How many berths does the port have, and how deep are they?
İZKA's 2019 report lists 26 berths and gives a total quay length of 3,650 m (the berth lengths in its table add up to 3,530 m); 10 of them are container berths. Because of silting, current depths are between 6 and 11.5 m, and the port can serve 24 vessels at the same time.
Does the port have a rail connection?
Yes. The İZKA report mentions the port's rail link and a rail logistics area; Alport has said it plans to raise rail's share of outbound cargo to 30%.
Is there a CFS (LCL) service?
The storage table in İZKA's 2019 report lists 1,818 m² of open and 1,810 m² of covered CFS area.
Will larger ships be able to call?
According to press reports, the approach channel is planned to be deepened to 17 m and dredging is planned to start in the first quarter of 2027. These are plans.
Sources
- TRT Haber. İzmir Limanı'nın Türkiye Varlık Fonu'na devri tamamlandı. https://www.trthaber.com/haber/ekonomi/izmir-limaninin-turkiye-varlik-fonuna-devri-tamamlandi-953052.html (published: 4 August 2026; accessed: 20 November 2026)
- Dünya Gazetesi. İzmir Limanı'na 1,5 milyar dolarlık modernizasyon. https://www.dunya.com/sehirler/izmir-limanina-15-milyar-dolarlik-modernizasyon-haberi-844024 (published: 16 October 2026; accessed: 20 November 2026)
- İzmir Kalkınma Ajansı (İZKA). TCDD İzmir Alsancak Limanının Geçmişten Günümüze Bölge Ekonomisi Açısından Değerlendirilmesi (2019) (kapakta "NİSAN - EKİM 2019"; gün yok, dönem sonu ayının 1'i 2019-10-01 olarak kodlandı). https://izka.org.tr/wp-content/uploads/pdf/liman-raporu.pdf (published: 1 October 2019; accessed: 20 November 2026)
- Yeni Asır. İzmir Körfezi'nde yenilenme dönemi: 400 metrelik dev gemiler geliyor. https://www.yeniasir.com.tr/izmir/2026/10/15/izmir-korfezinde-yenilenme-donemi-400-metrelik-dev-gemiler-geliyor (published: 15 October 2026; accessed: 20 November 2026)
Attributions
Values on this page come from the numbered sources above; a value without a source is not written. Data providers: TRT Haber; Dünya Gazetesi; İzmir Kalkınma Ajansı (İZKA); Yeni Asır.
Geography and imagery in the 3D scene:
- © OpenStreetMap contributors (ODbL)
- Contains modified Copernicus Sentinel data 2026
- Copernicus DEM GLO-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018, provided under COPERNICUS by the European Union and ESA; all rights reserved
- EMODnet Bathymetry Consortium (2022): EMODnet Digital Bathymetry (DTM). Representative colour gradient only
- Made with Natural Earth
Not for navigation. The data on this page is for information only; for navigation, berthing and port-admission decisions rely on official nautical charts and the notices of the port authority concerned.